Sign In | Join Free | My chinalane.org |
|
Categories | Low Pressure Foam Machine |
---|---|
Brand Name: | ZHMACH |
Model Number: | ZHP-2017 |
Certification: | CE Certificate |
Place of Origin: | Guangdong China (Mainland) |
MOQ: | one set |
Price: | inquiry |
Supply Ability: | One set per month |
Delivery Time: | 45 days |
Packaging Details: | Paper and Film, Wooden case The whole set of one standard 13groups need 1*20GP and 2*40HQ. |
Product Type: | Flexible foam making machine |
After-sales Service Provided: | Engineers available to service machinery overseas |
Flow: | Glass flow meter check flow |
Foam type: | Spray and trough |
Control: | automatic PLC with touch screen |
Foaming density: | 8Kg/m3~100kg/m3 |
Inverter: | Siemens/ Delta /Danfoss |
System: | R.S pulling system with plastic |
Company Info. |
Dongguan Zehui machinery equipment co., ltd |
Verified Supplier |
View Contact Details |
Product List |
Continuous Automatic Low Pressure Foaming Machine with Siemens Motor and Inverter
Product Description
The device is suitable for the production of hard/soft polyurethane
foam with 6-100 KG/M3 density , which is used in the fields of
furniture,bra,shoes,electronice,packaging,clothing,aviation,transportation,industrial
and civil building heat preservation and energy-saving.The
production line has automatic computer to control,PLC operating
system with high degree of automation and low production costs,it
is the ideal equipment for large enterprises.
[Specifications]
Dimension | L33M×W4M×H3M |
Foaming width | 980mm~2250mm |
Foaming height | Under 1200mm |
Foaming density | 8kg/m3~100kg/m3 |
Foaming speed | 2000rpm~7000rpm |
(1)The whole machine parts specifications:
1.Foaming control Platform(standard) L3m×W2.52m×H0.7m
2.Oven declining board (standard) L9m×W0.98m~2.30m
3.Oven side links(standard) L18m×W2.3m×H1.2m
4.Oven machine frame(standard) L18m ×W4m×H3m
5.Oven inner conveyer line (standard) L18m×W2.3m×H0.83m
6.Foam block cutter machine (standard) W2.3m×H1.30m(saw/knife with
cross type )
Motor | Guangdong brand |
Pump | Viking pump & Chinese pump |
Invertor | Siemens brand |
PLC | Siemens |
Temperature | Control system |
Type | Use | Specification | Qty |
Big material tank | PPG | 5m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system | 1 |
Big material tank | POP | 5m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system | 1 |
Big material tank | CaCo3 | 5m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system | 1 |
Big material tank | TDI | 5m³/δ5mm A3 steel plate, with temperature controlling, stirrer, filter system | 1 |
Big material tank | Flame retardant | 2m³/δ3m stainless steel, with filter system | 1 |
Big material tank | MC | 2m³/δ2mm stainless steel, with filter system | 1 |
Small material tank | Si | 180L/δ1mm stainless steel | 1 |
Small material tank | A-33 | 180L/δ1mm stainless steel, with filter system | 1 |
Small material tank | T9 | 180L/δ1mm stainless steel, with filter system | 1 |
Small material tank | H2O | 180L/δ1mm stainless steel | 1 |
Small material tank | Color | 180L/δ1mm stainless | 1 |
Small material tank | Anti-yellow | 180L/δ1mm stainless steel | 1 |
Small material tank | Black | 180L/δ1mm stainless steel | 1 |
Floor powder mixing tank | PPG, POP, Powder | 1.5m³/δ3mmA3 steel plate, with filter system | 1 |
Filter tank | POP, Powder | 1.5m³/δ4mmA3 steel plate | 1 |
How is the packing of the machine?
The entire machine will be nude packing. Some of the parts will be
pack in wooden case. Others will be simple pack with paper or foam
sheet with plastic film.
How many container will be needed for the whole set of machine?
Total three containers is enough 2*40HQ+1*20GP. In order to save
the place and the cost of delivery we will also put some parts that
inside the raw material tank.
We will try the best way to pack all the machine well and also save
the freight cost.
FAQ
Q: How many days for the install and testing of the machine?
A: After all the machine in your factory we will send 1-2 engineer
help to install the machine you must send someone to help about 30
days installation will finished. After that one electrician and one
foaming engineer will come to connecting the cable and run the
machine in 15days. Total 45days the machine can be running.
Q: For the cost of the engineer how much I need to pay?
A: You need to pay USD50 one day for one engineer and also need to
pay for the visa fee turn-round ticket fee and food hotel.
Q:What kind of raw material tools we need to prepare for the
testing?
A: We will send you a list for the tools that you need to prepare
for testing and also can help to buy if you required.
Q: After the machine testing if we need some engineer to stay in
our factory can you help to find?
A: Sure we can help to hire one experience engineer to work in your
factory but you need to discuss the salary and all details with
him.
Q:During the foaming if we have some problems abt the foam and the
machine how can we do?
A: You can just call our after sale manager explain for the
situation or send some picture we will help to handle within
24hours.
You are warmly welcome come and visit our factory.
![]() |