Sign In | Join Free | My chinalane.org
chinalane.org
Products
Search by Category
Home > Plastic Product Making Machinery >

Auto Memory Mattress Manufacturing Machines , Flexible Polyurethane Foam Production With Siemens Inverter

Categories Foam Production Line
Brand Name: ZHMACH
Model Number: ZFP-2017
Certification: CE Certificate
Place of Origin: Guangdong China (Mainland)
MOQ: one set
Price: inquiry
Supply Ability: One set per month
Delivery Time: 45 days
Packaging Details: Paper and Film, Wooden case The whole set of one standard 13groups need 1*20GP and 2*40HQ.
Product Type: Flexible foam making machine
Dimension(L*W*H): 3400*4550*4200mm
After-sales Service Provided: Engineers available to service machinery overseas
Flow: Glass flow meter check flow
Foam type: Spray and trough
Control: automatic PLC with touch screen
Foaming width: 980mm~2350mm
Foaming density: 8Kg/m3~100kg/m3
Inverter: Siemens/ Delta /Danfoss
System: R.S pulling system with plastic
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Auto Memory Mattress Manufacturing Machines , Flexible Polyurethane Foam Production With Siemens Inverter


Automatic Memory Polyurethane sponge Production Line with Siemens inverter


[Specifications]


DimensionL33M×W4M×H3M
Foaming width980mm~2250mm
Foaming heightUnder 1200mm
Foaming density8kg/m3~100kg/m3
Foaming speed2000rpm~7000rpm

(1)The whole machine parts specifications:


1. Foaming control Platform(standard) L3m×W2.52m×H0.7m

2. Oven declining board (standard) L9m×W0.98m~2.30m

3. Oven side links(standard) L18m×W2.3m×H1.2m

4. Oven machine frame(standard) L18m ×W4m×H3m

5. Oven inner conveyer line (standard) L18m×W2.3m×H0.83m

6. Foam block cutter machine (standard) W2.3m×H1.30m(saw/knife with cross type )


MotorGuangdong brand
PumpViking pump & Chinese pump
InvertorSiemens brand
PLCSiemens
TemperatureControl system

Gear pump types:


ModelSpecification

Use material


Qty/setBrand
K124A200L/min

PPG


1Viking Pump
K124A200L/min

POP


1Viking Pump
L32300L/min

CaCo3


1Viking Pump
NB-80120L/min

TDI


1Shanghai
NB-3230L/min

MC


1Shanghai
NB-2525L/min

Flame retardant


1Shanghai
GPY-66L/min

Si


1Japan
GPY-5.86L/min

A-33


1Japan
GPY-5.86L/min

T9


1Japan
GPY-11.58 L/min

H2O


1Japan
GPY-128 L/min

Colour1


1Japan
GPY-128 L/min

Anti-yellow


1Japan
GPY-128 L/min

Black color


1Japan

Remark:The above only for reference. All the data is subjected to sold products.


Packing & shiping

How is the packing of the machine?


The entire machine will be nude packing. Some of the parts will be pack in wooden case. Others will be simple pack with paper or foam sheet with plastic film.


How many container will be needed for the whole set of machine?


Total three containers is enough 2*40HQ+1*20GP. In order to save the place and the cost of delivery we will also put some parts that inside the raw material tank.


We will try the best way to pack all the machine well and also save the freight cost.


Our Services


We will help to design the layout of the machine that put in your factory.

We will send 2-4 experience engineers to install and testing the machines.

We will teach your engineer how to operate the machine and how to maintain the machines.

We will give you the machine operation manual and the best formulation for target products that you are going to make.


FAQ


Q: How many days for the install and testing of the machine?


A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.


Q: For the cost of the engineer how much I need to pay?


A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.


Q:What kind of raw material tools we need to prepare for the testing?


A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.


Q: After the machine testing if we need some engineer to stay in our factory can you help to find?


A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.


Q:During the foaming if we have some problems abt the foam and the machine how can we do?


A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.


You are warmly welcome come and visit our factory.

Quality Auto Memory Mattress Manufacturing Machines , Flexible Polyurethane Foam Production With Siemens Inverter for sale
Send your message to this supplier
 
*From:
*To: Dongguan Zehui machinery equipment co., ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0