Sign In | Join Free | My chinalane.org |
|
Categories | PTFE Filter Bag |
---|---|
Brand Name: | filter |
Model Number: | FLT-FB-238 |
Place of Origin: | china |
MOQ: | 50pcs |
Price: | Negotiable |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability: | 100000pcs per month |
Delivery Time: | 7 days |
Packaging Details: | carton |
Certification: | ISO9001 |
Usage: | Dust Filter,Liquid Filter,steel,Air Filter |
Type: | Pocket Filter,Mesh Filter Bag,pulse jet,reverse air,used to steel works equipments |
Material of bag: | Fiberglass,Nylon,PE,Non-woven,PTFE |
Material: | PTFE,Fiberglass,Nomex,Fiberglass / P84 / PTFE / Nomex,Polyester |
Application: | Industry Dust Collector,dust filter bag for cemet factory and so on,baghouse dust collector |
Product name: | PTFE nonwoven filter bags for waste incineration plant,PPS filter bags Dust Filter Bag,PTFE membrane Fiberglass filter cloth needled felt filter bag,PTFE film-coated filter bag for dust filter,Nylon Rosin Tea Coffee Filter Bag/ Dust Collector Bag Filter |
Shape: | customize |
Size: | Custiomized |
Micron rating: | Non Woven Filter Cloth |
Working temperature: | 120-150°C |
Thickness: | 1.8mm |
Name: | fiberglass dust filter bag |
Package: | Carton |
Temperature: | 130-300 deg. |
Samples: | 1-2pcs free |
Micron: | 200 Micron |
Materials: | PET/PPF/PPP/NMO,Polyester |
Company Info. |
Anhui Filter Environmental Technology Co.,Ltd. |
Verified Supplier |
View Contact Details |
Product List |
PPS, PTFE, P84, Nomex Polyester Filter Socks Filter Bags with PTFE for Industrial Bag Filter :
Description:
Technical Specification:
Fibre | Medium Alkali Fibreglass |
Scrim | Medium Alkali Fibreglass |
Weight(G/M2) | 630 |
Thickness (mm) | 0.6 |
Organization Structure | Plain Weave |
Width (mm) | ≤ 2.2 |
Length | 50m/roll |
Finish treatment | Silicone Oil Treatment and Oil&Water repellent Treatment. |
Air permeability (dm3/m2/s): | 220~310 |
Tensile strength (N/5× 20cm) | Warp:>1720 Weft:>1850 |
Tensile elongation (%): | Warp:<5 weft:=""> |
Temperature (ºC): | Continue: 260 Instant: 280 |
Application | Mainly used in Steel Plant,Cement Plant,Combustion,Coal burning boiler,Waster incineration,Carbon black producing. |
Features:
1) High temperature resistance with dimensional stability.
2) High Tensile breaking strength, acid and alkali resistance.
3) Mostly used as low price and high temperature condition.
Producing Process:
Install Diagram:
Applications:
More Production:
Packaging & Delivery:
Foreign Trade Team:
Exhibization:
Customer Visit:
Certificate:
Competitive Advantages:
1. 100% custom pass guaranteed.
2. Our products have been exported to Germany, Norway, Poland,
Finland, Spain, UK, France, Russia, USA, Brazil, Mexico, Australia,
Japan, Korea, Thailand, Indonesia, Uruguay and many other
countries.
3. Flexible and Untraceable payment terms.
4. Good after-sale service.
5. We offer high quality products at competitive price in quick delivery
Shipping Details:
SHIPPING (Normally arrive port time in working days) | ||||
Destination | Express/Courier | SHIP BY SEA | SHIP BY AIR | SHIP BY EMS |
DHL/FEDEX/UPS/TNT | ||||
North America | 3~7 days | 15~24 days | 5~7 days | 10~12 days |
South America | 3~7 days | 15~25 days | 5~7 days | 10~12 days |
European Countries | 3~7 days | 20~30 days | 5~7 days | 10~12 days |
Africa Countries | 3~7 days | 40~50 days | 5~7 days | 10~12 days |
The Middle East | 3~7 days | 15~25 days | 5~7 days | 10~12 days |
Australia | 3~7 days | 10~15 days | 5~7 days | 10~12 days |
FAQ:
Q1. What is your terms of payment?
A: T/T will usually be accepted,details could be negotiated.
Q2. What is your terms of delivery?
A: FOB, CFR, CIF, DAP, FCA, EXW
Q3. How about your delivery time?
A: Generally, it will take 10to 20 days after receiving your
advance payment. The specific delivery time depends on the items
and the quantity of your order.
Q4. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings.
Q5. What is your sample policy?
A: We could offer the sample for free charge but do not pay the
cost of freight.
Q6. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q7: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our
customers benefit ;
A:2. We respect every customer as our friend and we sincerely do
business and make friends with them.
Generally, It will take 10 to 20 days after receiving your advanced
payment. The specific delivery time depends on your items and
quantity of your order.
![]() |