Sign In | Join Free | My chinalane.org |
|
Categories | Stud And Track Roll Forming Machine |
---|---|
Brand Name: | CANGZHOU WILLING |
Model Number: | Double Deck Light Keel Frame |
Certification: | ISO CE |
Place of Origin: | CHINA MAINLAND |
MOQ: | 1 Set |
Price: | Negotiable |
Payment Terms: | L/C, T/T, D/A, D/P |
Supply Ability: | 20 Sets Per Month |
Delivery Time: | 30 Working Days |
Packaging Details: | 20' FLC |
Product Name: | Double Deck Light Keel Metal Roofing Villa Frame Stud and Track Roll Forming Machine |
Raw Material: | Galvalume, Galvanized |
Working Speed: | 30 m/min - 50 m/min High Speed |
Material Thickness: | 0.3 mm - 0.8 mm |
Advantage: | One Machine Can Produce Two Different Models at The Same Time |
Weight: | 4.5 Tons |
Company Info. |
Cangzhou Famous International Trading Co., Ltd |
Verified Supplier |
View Contact Details |
Product List |
Double Deck Light Keel Metal Roofing Villa Frame Stud and Track Roll Forming Machine
Specification
No. | Item | Description |
1 | Coil | Galvalume, Galvanized |
2 | Raw Material Thickness | 0.3 mm - 0.8 mm |
3 | Working Speed | 30-50 m/min |
4 | Roller Station | Depend one the different samples |
5 | Dimension (L*W*H) | 4000 mm*800 mm*1200 mm |
6 | Machine Weight | 4000 KG |
7 | Electrical Control System | Mitsubishi PLC (can be customized) |
8 | Drive Motor Power | 7.5 KW |
9 | Hydraulic Station Power | 5 KW |
10 | Power Supply | 380V, 60HZ, 3 PHASES(can be customized) |
11 | Cutting Accuracy | ± 1 mm |
12 | Driving Mode | Gear |
13 | Material of Shaft | 70 mm 45#steel forged |
14 | Material of Roller | 45# Steel Finish Machining, Plated Hard |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.
![]() |