Sign In | Join Free | My chinalane.org |
|
Categories | Mitsubishi |
---|---|
Brand Name: | Mitsubishi |
Model Number: | AX10-UL |
Certification: | ce |
Place of Origin: | Japan |
MOQ: | 1 pc |
Price: | negotiable |
Payment Terms: | L/C, T/T,Paypal |
Supply Ability: | 88 |
Delivery Time: | 1-5 work day |
Brand: | MITSUBISHI |
MPN: | AX10-UL |
Model: | AX10-UL |
Company Info. |
LINTURE Technology CO.,LTD |
View Contact Details |
Product List |
Brand: | MITSUBISHI |
---|---|
Condition: | New without factory packaging |
Model: | AX10-UL |
Shipping Weight: | 1.9 lbs |
Shipping Dimensions: | 10.5 x 7 x 2.25 in |
SKU: | R823102 (HON12) |
Category: | Input Modules |
Input points: 16 points.
Voltage: AC100~120V.
Current: 10mA.
Response time: 25ms.
16 points per common terminal..
20 point terminal block.
The system program memory is used to store system programs,
This includes managing programs, programs, and interpreting and
compiling user programs.
Composed of read-only memory. Used by the manufacturer, the content
cannot be changed and does not disappear after power outage.
With the development of PLC technology, the selection of PLC
products is increasing,
The functions are becoming increasingly perfect, and its
applications are also becoming more and more widespread.
The performance of PLCs of different series and models varies, and
their application scenarios also have different focuses,
There are also significant differences in price. Therefore, when
selecting a PLC,
On the premise of meeting control requirements,
We should consider the best performance price ratio and choose PLC
reasonably.
Each scanning process. Centralize sampling of input signals.
Concentrate on refreshing the output signal.
Enter the refresh process. When the input port is closed,
During the execution phase of the program, there is a new state at
the input end that cannot be read in.
The new state is only read in when the program performs the next
scan.
A scanning cycle is divided into input sampling, program execution,
and output refresh.
The content of the component image register changes with the
execution of the program.
The length of the scanning cycle is determined by three factors.
The speed at which the CPU executes instructions.
The time occupied by the instruction itself.
Number of instructions.
Due to the use of centralized sampling.
Centralized output method.
There is a phenomenon of input/output lag, i.e. input/output
response delay.
Our advantage Products:
【Yaskawa】Servo Drive / Servo Motor
【Mitsubishi】Servo Drive / Servo Motor
【Honeywell】Module DCS / PLC
【Emerson】DeltaV Module / Servo Motor
【ABB】Input Output Module
【AB】Module / Touch Screen
【Rosemount】Pressure and Temperature Transmitter
【Yokogawa】Pressure Transmitter
【GE】IC69 Series PLC/ Fanuc Servo Motor and Drive
(Modicon,SMC,SICK,NORGREN,Siemens etc.)
Linture Technology Co,. Ltd
Contact person: Vivian
E-mail: linture0319@163.com
Cellphone: +0086-18026552038
Wechat:18026552038
WhatsApp:+86 18026552038
Tag:electric servo drive,
ac servo drive,
ac servo pack
![]() |