Sign In | Join Free | My chinalane.org |
|
Categories | LED Tube Bracket |
---|---|
Brand Name: | ZOMLNK |
Model Number: | ZK-TU103 |
Certification: | CE, RoHS |
Place of Origin: | Guangdong, China |
MOQ: | 1pc |
Price: | Negotiable |
Payment Terms: | L/C, T/T, Western Union |
Supply Ability: | 20,000pcs per week |
Delivery Time: | 1-30 days |
Packaging Details: | Color box + master carton as per standard export packaging |
Keyword: | Fluorescent LED Tube Light |
End Cap: | G13 / Rotatable G13 / T8 to T5 |
Lamp Body Material: | Aluminum + PC |
Length: | 2ft/3ft/4ft/5ft/6ft/8ft |
CRI: | 80 |
Working Time (hours): | 10000 hrs |
Working Temperature: | -10-55℃ |
Input Voltage (V): | AC100-277V/100-240V 50/60Hz |
Company Info. |
Zhongshan zuoling Lighting Co., Ltd |
Verified Supplier |
View Contact Details |
Product List |
Transparent T8 Led Tube Light CE ROHS 2FT 4FT Fluorescent LED Tube Lamp 1200mm
Product description of transparent T8 led tube light:
T8 led tube are designed to look like and fit into fixtures for traditional linear fluorescent lamps. They are frequently used to update and convert offices or warehouse spaces to more energy efficient lighting systems.
Where can they be installed?
They (fluorescent led tube lamps) are installed widely. Such as supermarkets, garages, offices, workshops, factories and other indoor places.
Key information of T8 led tube light 4ft:
Rotatable cap | G13/R17D/Fa8/Rotatable Cap Can Be Optional, Meet Your More Needs. | |||
Size | 2Ft, 3Ft, 4Ft, 5Ft, 6Ft, 8Ft, Make Appointed Size To Match Your
Project. | |||
Watt | 9w, 13w, 18w, 22w, 28w, 44w, High Brightness, No Flicker, Protect
Your Eyes. | |||
Lumens | 2ft-1080LM, 3ft-1560LM, 4ft-2160LM, 5ft-2640LM, 6ft-3360LM, 8ft-5280LM | |||
Material | 0.8mm Thickness Aluminum Housing And Heat Aging Resistance PC For
Excellent Heat Dissipation, Longer Service Life. | |||
Application | Widely Use In Offices, Garages, Hospitals, Libraries, Classrooms
And Other Indoor Places. | |||
Packageing | 20~50 PCS in Normally Carton, Accept Your Special Demands, Let You
Save Time. | |||
MOQ | Low MOQ 1 pcs , Avoid Unnecessary Waste of Your Products and Money. | |||
Sample Time And Bulk Time | Sample Time Around 3-5 Working Days; Bulk Time Around 10-15 Working Days.Do What You Want, Think What You Care. | |||
Payment Terms | Only 30% Deposit, 70% balance to be paid before shipment. | |||
Shipping | By Air or Sea. If Choose by Air, it is Faster Like You Purchase
from Local Market. | |||
Others Services | Test IES For Free |
Photos of 1200mm LED Tube Lamp:
![]() |