Sign In | Join Free | My chinalane.org |
|
Categories | Lightning Surge Arrester |
---|---|
Brand Name: | XDEM |
Model Number: | Q345, Q235, Q345B, Q235B |
Certification: | CE ISO9001 |
Place of Origin: | Hebei,China |
MOQ: | 1set |
Price: | USD1500-2200 |
Payment Terms: | L/C, T/T |
Supply Ability: | 10000 Square Meter/Square Meters per MonthS |
Delivery Time: | 22-30days |
Purlin:: | C/Z Galvanized Steel(Q235) |
Surface treatment: | 1. Painting 2. Galvanized |
Wall&Roof panel: | Steel Sheet +Fiber Glass Sandwich Panel |
Color: | Customized |
Door: | Sliding Door Roller Door |
Company Info. |
Nanyang Xinda Electro-Mechanical Co., Ltd. |
Verified Supplier |
View Contact Details |
Product List |
Product description
The container house designed and produced by our company is based on unit container house modules. According to actual needs, customers can freely assemble and splice; at the same time, container houses can be flexibly spliced up and down, left and right, and arranged arbitrarily, so as to realize customers' different needs.
Container house size | 3m*6m*2.8m |
Area | 18 sqm |
Main structure | Beam, Wall panel, Pillar, Lifting part, Floor, Square tube |
Wall&Roof panel material | EPS, PU, glass fiber, rock wool |
More project cases
You only need to tell us your specific needs, and we have
professional designers who can design solutions for you for free
according to your requirements. One-story, two-story, three-story,
multi-story, if you need, we can custom for you.
More available usages
The container house can be used as office, refuge, hospital,
clinic, medical station, camp and so on. And the house layout can
be customized according to your requirement.
1.Q: Could you please design a new and unique prefab house for me?
A: Absolutely! We are able to provide you with not only
construction scheme, but landscape design! One-stop service is our
outstanding superiority with no doubt.
2.Q: What should I provide to build a prefab house?
A: So easy! Sketch drawing would be a better reference for us.
However, you will never mind if you don't have any. Simply notify
us your requirements, such as the area, usage and the stories of
the house. Before long, you'll possess an amazing design.
3.Q: How could I ensure the cost of building a prefab house?
A: Firstly, the designing scheme should be accepted. Then, the
kinds of building materials should be confirmed since different
types and qualities make various prices. After that, we will send
you a detailed quotation.
4.Q: How Long does it take to build a light steel prefab house?
A: It depends on the size of the house. Generally, one 50 square
meter house five workers 1-3days finished installation, save
manpower and time
5.Q: Is it difficult to build a prefab house?
A: Totally not, you can build the house independently according to
the construction drawings as long as you know how to use an
electric tool.
6.Q: Does this kind of house can only be used in residential
buildings?
A: Absolutely not. It can be used in all kinds of buildings, such
as hotel, office, school, entertainment club, light industrial
workshop, etc.
7.Q: Is prefab house stable?
A: Set your hearts at rest! You are completely safe living in light
steel prefab house even if there are hurricanes of 200km/h and
9-grade earthquake outside.
8.Q: what are the advantages of prefab house compared to the
traditional building?
A: Better isolation of sound and heat, Better fireproof and
anti-seismic, Wind resistance, Time and labor saving, More usable
area, Excellent termite-proof capability
9.Q: Does prefab house look different from the ordinary one?
A: Yes. prefab house is more beautiful and suitable for any style.
10.Q: How do we cooperate on certain project?
A: Firstly, please send us your project details and your
requirements. Then we will design accordingly, free of charge.
Afterwards, please check and confirm whether you like the drawings.
If not, we shall get the drawings revised until your confirmation.
Finally, we make a deal on alibaba.com with Trade Assurance.
Project details ---> Drawings for your project ---> Revised
drawings ---> Transaction confirmation with Trade Assurance
11.Q: What is the delivery time?
A: Delivery time depends on order quantities. Generally, the
delivery time will be 15-25 days after receiving the deposit.
![]() |